Industry News

Delays and detour ahead for truckies on New England Highway

Truckies are advised of changed traffic conditions from next week on the New England Highway at Tenterfield in NSW to replace a culvert at Ghost Gully.

The work starts on Monday, January 13, and will be carried out from 7am to 6pm on weekdays and 8am to 1pm on Saturdays, and is expected to be finished by late May, weather permitting.

Truckies should expect delays of up to five minutes for the next few months. Image: TfNSW

Transport for NSW said single lane, alternating traffic flow arrangements will be required for the duration of work, with a reduced speed limit of 40km/h for the safety of workers and road users.

Oversize and overmass (OSOM) vehicles more than 4 metres wide are asked to detour via Old Ballandean Road and Mount Lindesay Road. They can call the project team on 0411 021 138 prior to travel to discuss.

The detour route for OSOM vehicles. Image: TfNSW

Truckies are advised to allow up to five minutes extra travel time, drive to the conditions and follow the directions of signs and traffic control.

For the latest traffic updates download the Live Traffic NSW app, visit livetraffic.com or call 132 701.

[signup]

The post Delays and detour ahead for truckies on New England Highway appeared first on Big Rigs.

  1. Australian Truck Radio Listen Live
Send this to a friend